Visitors Now: | |
Total Visits: | |
Total Stories: |
Story Views | |
Now: | |
Last Hour: | |
Last 24 Hours: | |
Total: |
The solar panels on NASA’s MAVEN Mars orbiter are deployed as part of environmental testing procedures at Lockheed Martin Space Systems in Littleton, Colorado, before shipment to Florida on Aug. 2 and blastoff for Mars on Nov. 18, 2013. Credit: Lockheed Martin
See videos below
MAVEN is NASA’s next mission to Mars and in less than three days time the spacecraft ships out on a cross country trek for the first step on the long sojourn to Mars.
But before all that, technicians took MAVEN for a final spin test, flexed her solar arrays and bombarded her with sound and a whole lot more.
On Aug. 2, MAVEN (Mars Atmosphere and Volatile EvolutioN Mission) ships half a continent from its assembly facility at Lockheed Martin in Littleton, Colorado to the Kennedy Space Center and the Florida Space Coast. (…)
Read the rest of MAVEN Takes Final Test Spins, Flexes Solar Panels Before Imminent Trek to Florida Launch Site (357 words)
© Ken Kremer for Universe Today, 2013. |
Permalink |
No comment |
Post tags: Mars, Mars MAVEN, MAVEN, NASA
Feed enhanced by Better Feed from Ozh