Online: | |
Visits: | |
Stories: |
NUKE PRO: Exposing Truth Anti-Nuclear Information and Resources, and Disaster Preparation Planning: http://nukeprofessional.blogspot.com/ I have been writing articles about Pilgrim en masse.
Were they a part of the Shutdown, I do believe so.
Here is the prior articles:
http://nukeprofessional.blogspot.com/2015/08/10-copper-pipe-shuts-down-pilgrim.html
Last Saturday, Pilgrim shut down again. Was the problem some hack attempt, a Stuxnet type virus, major crack, giant earthquake, massive human error?
No, the problem was a 1/2″ copper tube
- See more at: http://nukeprofessional.blogspot.com/2015/08/10-copper-pipe-shuts-down-pilgrim.html#sthash.LM1dpj4R.dpuf
FOR Instance Pilgrim Nuke in Boston, has an ever increasing string of problems and emergencies. In Jan 2015 they were one step away, one hail Mary away from releasing a massive blast of radiation direct from the reactor vessel. They had multiple failures, things that had failed just a year earlier and were not properly fixed and tested.
Last Saturday, Pilgrim shut down again. Was the problem some hack attempt, a Stuxnet type virus, major crack, giant earthquake, massive human error?
No, the problem was a 1/2″ copper tube
http://nukeprofessional.blogspot.com/2015/08/drug-testing-us-nuclear-plants-nuke-is.html
The USA's nuclear plants are owned by greedy corporations using druggies and alcoholics to run the nuclear plants.Second reportable employee incident at Pilgrim nuclear plant in two weeks
http://plymouth.wickedlocal.com/article/20150804/NEWS/150808815
http://nukeprofessional.blogspot.com/2015/06/replacing-indian-point-nuclear-plant.html
First we look at the average annual energy Indian Point has generated 3,687,000,000 kWH/Yr
Then we look at how much solar PV would be need to exceed that 10 Million Panels, Exceeding Pilgrim Production at 3,850,000,000 kWH/Yr
Then we look at what that PV would cost $2,034,000,000
Then we look at what the cost per kWH would be to the PV owner. 1.79 cents per kWH
http://nukeprofessional.blogspot.com/2015/05/we-almost-lost-new-york-boston-and-lake.html
Pilgrim was very close to being forced to directly vent radioactive steam into the environment / neighborhood. They used every last line of defense they had, including dumping radioactive steam into the old BWR Torus aka Surge Tank.
http://nukeprofessional.blogspot.com/2015/02/pilgrim-nuclear-in-boston-came-very.html
If that last piece of equipment had failed it would have been a serious accident with radiation exposure to the public.Pilgrim had the same types of equipment problems in the last 2 years, and FAILED to fix them, and the NRC failed on adequate follow up.
—————————————————-these folks did and are doing a fine job
http://www.pilgrimwatch.org/
Last Saturday, Pilgrim shut down again. Was the problem some hack attempt, a Stuxnet type virus, major crack, giant earthquake, massive human error?
No, the problem was a 1/2″ copper tube
- See more at: http://nukeprofessional.blogspot.com/2015/08/10-copper-pipe-shuts-down-pilgrim.html#sthash.LM1dpj4R.dpuf
Last Saturday, Pilgrim shut down again. Was the problem some hack attempt, a Stuxnet type virus, major crack, giant earthquake, massive human error?
No, the problem was a 1/2″ copper tube
- See more at: http://nukeprofessional.blogspot.com/2015/08/10-copper-pipe-shuts-down-pilgrim.html#sthash.LM1dpj4R.dpuf
Last Saturday, Pilgrim shut down again. Was the problem some hack attempt, a Stuxnet type virus, major crack, giant earthquake, massive human error?
No, the problem was a 1/2″ copper tube
- See more at: http://nukeprofessional.blogspot.com/2015/08/10-copper-pipe-shuts-down-pilgrim.html#sthash.LM1dpj4R.dpuf