Visitors Now:
Total Visits:
Total Stories:
Profile image
By Markosun\'s Blog
Contributor profile | More stories
Story Views

Now:
Last Hour:
Last 24 Hours:
Total:

New Supertall Skyscraper rising in New York City

Thursday, November 15, 2012 0:31
% of readers think this story is Fact. Add your two cents.

(Before It's News)

Anything and everything anytime

They just don’t stop building giant skyscrapers in the Big Apple.  This newest one will be the tallest in the city when it comes to roof height, a touch higher than the new One World Trade Center.  One WTC will have 105 floors, this new one will only have 89 floors, this is because it will have 12 foot ceilings.

432 Park Avenue is a supertall residential project by CIM Group for Midtown Manhattan, New York City, USA. With a height of 1,380 feet (420.5 m), 147 condominium apartments, it will become one of the tallest buildings in the United States, as well as the tallest building in New York City to the roof, surpassing both the new and old World Trade Center buildings, and second tallest in total height behind One World Trade Center. Originally proposed at 1,300 feet (396 m) in 2011, the building is set for a 2012 start date and expected completion in 2016.  Located at 432 Park Avenue, the building required the demolition of the 495 room Drake Hotel built in 1926. In 2006 the hotel was sold for $440 million to developer Harry Macklowe. It was demolished in 2007. The site became one of New York’s most valuable development sites due to its location in the heart of the city. With an estimated cost of US $1 billion, the building’s amenities will include 12 ft (3.7 m) high ceilings, golf training facilities, and private dining and screening rooms.

Construction

The work on the foundation began in September 2011 and by May 2012 the first re-bars were installed at the base of the foundation. The building is expected to reach grade level by early 2013. Given the simplicity of the design, the building is expected to rise at a rate of one floor per week with the mechanical floors taking around 2 weeks. It is expected to be topped out by early 2015, completed by mid 2015 and ready for occupancy by late 2015 or early 2016.



Source:

Report abuse

Comments

Your Comments
Question   Razz  Sad   Evil  Exclaim  Smile  Redface  Biggrin  Surprised  Eek   Confused   Cool  LOL   Mad   Twisted  Rolleyes   Wink  Idea  Arrow  Neutral  Cry   Mr. Green

Top Stories
Recent Stories

Register

Newsletter

Email this story
Email this story

If you really want to ban this commenter, please write down the reason:

If you really want to disable all recommended stories, click on OK button. After that, you will be redirect to your options page.