Half bath: Demo Day and Tiling Progress

Tuesday, December 6, 2016 7:30
% of readers think this story is Fact. Add your two cents.

(Before It's News)

I posted my plans for our main floor half bath more than three months ago, and then things went quiet. We had a busy Fall, and a hard time finding back-to-back weekends that we could devote to working on the bathroom.

Thankfully, Demo Day is finally here!
As a reminder, here's what we've been living with for the past 8 months:
B4INREMOTE-aHR0cHM6Ly8xLmJwLmJsb2dzcG90LmNvbS8tVGwxSkhIR1BuckUvVjdSUl9OTllZdEkvQUFBQUFBQUFObFEvZk4wRTVuN3VMbUUxMlNPVE9KZ2FGd2UxMFhFY0ZyUk5RQ1BjQi9zMTYwMC9oYWxmJTJCYmF0aC5wbmc=
Perfectly functional, but not the least bit pretty. On a Saturday morning, Adam ripped out the existing vanity, toilet, flooring, and accessories. 
B4INREMOTE-aHR0cHM6Ly8xLmJwLmJsb2dzcG90LmNvbS8td29LZ000bHoyc0kvV0VXano2OEY0N0kvQUFBQUFBQUFOdjAvREVYZkk0YllZNFE4Q2lFUFZQRTVXSDFnVXU0VEUtZ3pnQ0xjQi9zNjQwL0lNR18zODMxLkpQRw==

With the room clear, I started patching and painting the walls (CIL's 'White on White'). I also spent a back-breaking evening ripping up two layers of 1/4″ sub-floor that had been nailed and stapled to the original sub-floor every 2″ or so. It was torture.

On Friday, my Dad came to help me install cement board on the floor and tile the floor and back wall. It was my first time tiling, so I was happy (desperate?) to have his help. He did the measuring, figuring, and cutting, while I laid the tiles. And, by the end of the weekend, we had this:

B4INREMOTE-aHR0cHM6Ly80LmJwLmJsb2dzcG90LmNvbS8tQnNDM1NFdk8zd1EvV0VXblR1U2N4bkkvQUFBQUFBQUFOdjgvZnByV1dzV2hTQ0VuZ2lnX2hjOGxYOVBrSlBfY3ZFNWhnQ0xjQi9zNjQwL0lNR18zODUwLkpQRw==

The floor tiles are 18″ x 18″ ceramic, purchased for a steal at Floors Plus. We got such a good deal on the floor tiles (and our $10 Kijiji sink) that we didn't mind splurging on those beautiful 2″ x 10″ glass subway tiles (purchased at Centura Tile). I'm planning to use a dark grout on the floor and a light grey grout on the wall.

After the tiles had time to set, I installed the new light fixture (it looks like the single sconce is no longer available, but here's the double version):

B4INREMOTE-aHR0cHM6Ly8zLmJwLmJsb2dzcG90LmNvbS8tU0tWcVhMS2dSX2cvV0VXcHBXclJnUEkvQUFBQUFBQUFOd0kvSkt4RWlfWm14Zzh0NjRsN1BzdEQ4eVdVTkVtMjFnUmNBQ0xjQi9zNjQwL0lNR18zODUzJTJCJTI1MjgxJTI1MjkuSlBH

The board/metal bracket gives you an idea of where the sink will go (it will be centered under the light and cover the entire board/bracket). I was one tile short from being able to install another row, so I ordered another box and the plan is to install two more rows when it arrives next week. That means we'll have three rows of tile above the sink, just like in my inspiration photo.

In the meantime, my plan is to grout the floor and finish patching and painting the walls. Oh, and we still need to purchase a new toilet. More soon!

Read more at House Pretty



Source: http://house-pretty.blogspot.com/2016/12/half-bath-demo-day-and-tiling-progress.html

Report abuse

Comments

Your Comments
Question   Razz  Sad   Evil  Exclaim  Smile  Redface  Biggrin  Surprised  Eek   Confused   Cool  LOL   Mad   Twisted  Rolleyes   Wink  Idea  Arrow  Neutral  Cry   Mr. Green

Top Stories
Recent Stories

Register

Newsletter

Email this story
Email this story

If you really want to ban this commenter, please write down the reason:

If you really want to disable all recommended stories, click on OK button. After that, you will be redirect to your options page.