Online: | |
Visits: | |
Stories: |
Story Views | |
Now: | |
Last Hour: | |
Last 24 Hours: | |
Total: |
On 11/5/2015, Tepco released the video of mock-up training without any explanation.
The video has only 20 seconds and no other description is attached. The location of this mock-up facility is not reported either.
The facility consists of only a part of the steel frame of Reactor 1 building.
The title reads it is about the mock-up training to remove the troubling steel frame of Reactor 1 building. The actual training is not recorded.
http://photo.tepco.co.jp/date/2015/201511-j/151105-01j.html
Iori MochizukiThe post Tepco suddenly released the video of mock-up facility to dismantle Reactor 1 appeared first on Fukushima Diary.