Online:
Visits:
Stories:
Profile image
By Fukushima Diary
Contributor profile | More stories
Story Views

Now:
Last Hour:
Last 24 Hours:
Total:

Tepco to dismantle the entire roof of Reactor 2 / “Largely emits radioactive material but fast”

Friday, November 27, 2015 7:26
% of readers think this story is Fact. Add your two cents.

(Before It's News)

On 11/26/2015, Tepco and METI (Ministry of Economy, Trade and Industry) announced they plan to dismantle the entire roof of Reactor 2 building.

This is to remove the nuclear fuel stocked in the SFP 2 (Spent Fuel Pool of Reactor 2). It is reported that it stores 587 spent fuel assemblies and 28 new fuel assemblies. The pool is located on 5th floor. They plan to remove the entire wall and roof above the floor.

They commented that the construction is going to start in the end of 2016, but the exact date is not announced yet.

Tepco turned down all the other ideas to remove only a part of the roof in order to minimize the radioactive material that can be spread out. They state it is because the estimated construction duration is the shortest.

http://www.tepco.co.jp/nu/fukushima-np/roadmap/images/d151126_07-j.pdf

Iori Mochizuki

The post Tepco to dismantle the entire roof of Reactor 2 / “Largely emits radioactive material but fast” appeared first on Fukushima Diary.



Source: http://fukushima-diary.com/2015/11/tepco-to-dismantle-the-entire-roof-of-reactor-2-largely-emits-radioactive-material-but-fast/

Report abuse

Comments

Your Comments
Question   Razz  Sad   Evil  Exclaim  Smile  Redface  Biggrin  Surprised  Eek   Confused   Cool  LOL   Mad   Twisted  Rolleyes   Wink  Idea  Arrow  Neutral  Cry   Mr. Green

Top Stories
Recent Stories

Register

Newsletter

Email this story
Email this story

If you really want to ban this commenter, please write down the reason:

If you really want to disable all recommended stories, click on OK button. After that, you will be redirect to your options page.