Visitors Now:
Total Visits:
Total Stories:
Profile image
Story Views

Now:
Last Hour:
Last 24 Hours:
Total:

Obama Administration Pushes Ahead with $6 Billion Plutonium Lab in New Mexico

Monday, November 14, 2011 14:58
% of readers think this story is Fact. Add your two cents.

(Before It's News)

Monday, November 14, 2011

Obama Administration Pushes Ahead with $6 Billion Plutonium Lab in New Mexico

Chemistry and Metallurgy Research Replacement Facility (photo: Los Alamos National Laboratory)

 

Despite lacking what critics say is a clear purpose or mission, the Department of Energy is planning to invest $6 billion in building a new plutonium facility at the nation’s leading scientific lab.   Los Alamos National Laboratory wants to have a “Chemistry and Metallurgy Research Replacement” (CMRR) Nuclear Facility, which has been on the books since 1999. Back when it was first proposed, the cost was estimated to be $375 million.

 

Now, the price tag is anywhere from $4.5 billion to $6.5 billion, according to the Los Alamos Study Group, a local watchdog organization.   The study group has filed two lawsuits against the government to try to stop the project from being completed.  

 

When it was originally proposed, the new facility was going to handle only small samples of plutonium, with perhaps a total of 900 grams on hand. Today, the Energy Department is talking about having the CMRR store up to six metric tons of plutonium—enough to rebuild the entire U.S. arsenal of nuclear warheads. The stated purpose of the facility is “to conduct experimental and industrial processes involving large quantities of plutonium, primarily in support of nuclear warhead core (‘pit’) manufacturing.”  

Opponents of the project cite various safety problems at Los Alamos to make their point about killing the CMRR. Recently, it was reported that the lab had repeatedly missed deadlines to fix nuclear safety issues that could lead to accidental chain reactions.

-Noel Brinkerhoff  

 

Nuclear Weapons Policy Group Files Second Lawsuit to Halt Proposed $6 Billion Los Alamos Plutonium Building (Los Alamos Study Group) A Giant New Plutonium Complex at Los Alamos (by Mary Charlotte-Domandi, Huffington Post) Questions About LANL’s Safety Program Raised (by John Fleck, Albuquerque Journal)

Despite Fire Threat to Los Alamos Lab, Plans Proceed for Plutonium Bomb Factory (by Noel Brinkerhoff and Ken Broder) 

 

Source

Report abuse

Comments

Your Comments
Question   Razz  Sad   Evil  Exclaim  Smile  Redface  Biggrin  Surprised  Eek   Confused   Cool  LOL   Mad   Twisted  Rolleyes   Wink  Idea  Arrow  Neutral  Cry   Mr. Green

Top Stories
Recent Stories

Register

Newsletter

Email this story
Email this story

If you really want to ban this commenter, please write down the reason:

If you really want to disable all recommended stories, click on OK button. After that, you will be redirect to your options page.