Visitors Now: | |
Total Visits: | |
Total Stories: |
Story Views | |
Now: | |
Last Hour: | |
Last 24 Hours: | |
Total: |
From
The new build is at the Tianwan site in Jiangsu province. An AES-91 VVER-1000 unit designed by Gidropress and supplied by Russian state firm Rosatom. Tianwan 3 is slated to begin power generation in 2018, with unit 4 expected to follow one year later, operated by China National Nuclear Corporation. Tianwan 3 is now the 30th large power reactor under construction in China – and the fourth to be approved and begin work since the Fukushima accident of March 2011.
2. Control room engineers at Ningde 1 sent power to the grid for the first time, in the Fujian province of China. Further tests remain before the reactor will reach the next official stage, commercial operation, in which it will generate power solidly for a lifespan expected to be 60 years.
See more and subscribe to NextBigFuture at 2012-12-29 23:00:40 Source: http://nextbigfuture.com/2012/12/china-generates-power-at-ningde-1.html