Online:
Visits:
Stories:
Profile image
By Modern Day Redneck
Contributor profile | More stories
Story Views

Now:
Last Hour:
Last 24 Hours:
Total:

A Little Bit Of Both

Monday, February 2, 2015 9:48
% of readers think this story is Fact. Add your two cents.

(Before It's News)

We finally got a little work done on the House, but first…..

Two weekends ago we went to College Station and cooked some Texas Red Chili with Jessie.

B4INREMOTE-aHR0cDovLzIuYnAuYmxvZ3Nwb3QuY29tLy1fdDhjZ2M5cGprby9WTS1haGZXVm5MSS9BQUFBQUFBQUVWYy9xZzU4X3dMWGlOOC9zMTYwMC9Db2xsZWdlJTJCU3RhdGlvbi5qcGc=

Our best friends and their daughter came with us and we had a great time. Neither me, Candy or Jessie placed in CASI chili, but I did win 2nd in Harley Davidson Show and Candy won 2nd in Peoples Choice Chili. It's a great cook off and we plan to go every year.

One day I will own one, maybe

B4INREMOTE-aHR0cDovLzIuYnAuYmxvZ3Nwb3QuY29tLy1wTnVwN1FTU2xTZy9WTS1iVXNpbHgySS9BQUFBQUFBQUVWay85TWhvSXU2MU1Wdy9zMTYwMC9NZS5qcGc=

B4INREMOTE-aHR0cDovLzQuYnAuYmxvZ3Nwb3QuY29tLy1NempneC1QTTVDTS9WTS1iOGhBbXhUSS9BQUFBQUFBQUVWcy9TWFpkVmdvMy1TRS9zMTYwMC9CYXRocm9vbTEuanBn

Being I have been neglecting my first priority, the house, I worked on it every night after work and really made some progress this weekend.
I finished the plumbing throughout the whole house and pressurized all the lines to check for leaks. Then I installed the Hardi Backer for the floor in the Bathroom and got everything ready for the tile. After that I insulated the Bathroom Back Wall by putting two layers of R30 sheeting behind the pipes and R13 bats in front.

B4INREMOTE-aHR0cDovLzIuYnAuYmxvZ3Nwb3QuY29tLy1ZdjJFZXczcnVucy9WTS1jQWVaWGNYSS9BQUFBQUFBQUVWMC90bVR2NWFMNXJ4QS9zMTYwMC9CYXRocm9vbS5qcGc=

Candy went and bought the toilet, the bathroom sink, tub and sink fixtures, the tile and the wine barrel for the sink to sit on. This pic shows the tile color and what the sink will kinda look like on top of the barrel. The sink faucet will be one of those open flow types that is polished bronze. I think it looks like an old timey hand water pump.  
The walls will be box planks we plan to pick up this week and start on.

As you can tell, we are working on the bathroom first, then the hallway and closet, then to the bedroom and finally the kitchen.

This week and weekend plans are to terminate the electrical through the whole house, tile the bathroom floor, pick up the bath tub, plumb in the drains for the tub, sink, toilet and washer. Then if I have any time left, I plan to start the box planks on the walls.

All that and we will also be cooking chili this weekend in Irving at a big cook off.  We missed this one last year because we went to Rankin to cook, but this time we are staying close to home.

It's not much, but it's at least something.

See ya,
Jerry



Source: http://moderndayredneck.blogspot.com/2015/02/a-little-bit-of-both.html

Report abuse

Comments

Your Comments
Question   Razz  Sad   Evil  Exclaim  Smile  Redface  Biggrin  Surprised  Eek   Confused   Cool  LOL   Mad   Twisted  Rolleyes   Wink  Idea  Arrow  Neutral  Cry   Mr. Green

Top Stories
Recent Stories

Register

Newsletter

Email this story
Email this story

If you really want to ban this commenter, please write down the reason:

If you really want to disable all recommended stories, click on OK button. After that, you will be redirect to your options page.