Here is a sneak preview of what the bathroom is looking like.
We set the toilet last night and finished the inside plumbing. It sits off to the right of the tub.
This weekend I will build the shower curtain rod and get that installed but tonight we will be doing the outside plumbing and hooking the house up to the septic tanks and water supply.
The washer dryer combo will sit in the back right corner and will be installed at a later date.
Then it's out into the hallway and closet to get those areas done. It should take about two weeks to complete those I hope then on to the bedroom.
We are taking a month off of chili cooking so I am hoping to get something done on this huge project I put on myself, the pressure is building.
Gotta run,
Jerry